Overview
At the Check-out stage, you will see 4 options under "Actions". Each option will assist you in dividing your time correctly. Using the "Switch" function is like splitting your time, only doing it in real-time.
Switching a code, work type, or project will end your current time entry and create a new one with the new info you choose.
Using the actual "Spilt Time" function is allocating or assigning all your time at once to different attributes.
Options
Switch Project - Using a "Switch" button will end your current time entry and start a new entry with the correct Project, code, or Work Type you selected.
Switch Cost Code - Change your cost code to the one you need
Switch Work Type - Change your work classification
Split time - Split out your time to reflect the correct location(s), Codes, Work type, or Equipment.